01
Utilities
Utility relocations are often the most schedule-sensitive part of an infrastructure job. We work early and directly with electric, gas, telecom, water, sewer, storm drain, irrigation and petroleum owners to keep projects moving — from concept and design approval through bid package, procurement, relocation, construction support and closeout.
Relevant projects · 9
- California High-Speed Rail Authority Construction Package 1
- PG&E Gas and Electric Relocations (300+ conflicts)
- AT&T Relocations (300+ conflicts)
- Dry/Wet Utilities (300+ conflicts)
- City of Fresno Water/Sewer
- Fresno Irrigation District / Madera Irrigation District
- Fresno Metropolitan Flood Control District
- Lumen / Sprint / Verizon
- Kinder Morgan

